1 |
01. Introduction and Project Overview |
|
5.90 MB |
|
|
2 |
02. Basic scene set-up in 3ds Max Layer Management |
|
71.65 MB |
|
|
3 |
03. Modeling of main boiler model |
|
65.02 MB |
|
|
4 |
04. Refining the boiler model |
|
39.06 MB |
|
|
5 |
05. Modeling front boiler hatch |
|
52.84 MB |
|
|
6 |
06. Naming and refining front boiler hatch |
|
10.89 MB |
|
|
7 |
07. Modeling of rear boiler section |
|
30.92 MB |
|
|
8 |
08. Further development of rear boiler model |
|
44.15 MB |
|
|
9 |
09. Positioning and refining of rear boiler section |
|
33.34 MB |
|
|
10 |
10. Modeling smoke stack and conforming mesh |
|
35.96 MB |
|
|
11 |
11. Modeling top portal conform brush introduction |
|
37.63 MB |
|
|
12 |
12. Modeling second Boiler Portal |
|
35.76 MB |
|
|
13 |
13. Modeling of locomotive bell components |
|
68.32 MB |
|
|
14 |
14. Modeling headlight and brackets |
|
35.37 MB |
|
|
15 |
15. Modeling headlight shade |
|
31.20 MB |
|
|
16 |
16. Detach headlight lense model front license plate |
|
27.44 MB |
|
|
17 |
17. Headlight acess door modeling |
|
26.44 MB |
|
|
18 |
18. Poly modeling of front and side lamps |
|
41.08 MB |
|
|
19 |
19. Refine and develop lamp models |
|
22.49 MB |
|
|
20 |
20. Modeling of lamp mounting brackets creation of selection sets |
|
38.08 MB |
|
|
21 |
21. Laying out splines for the locomotive chassis |
|
16.62 MB |
|
|
22 |
22. Continued development of the chassis using spline booleans |
|
30.73 MB |
|
|
23 |
23. Spline boolean subtraction refinement of the chassis |
|
17.72 MB |
|
|
24 |
24. Continued development of the chassis using spline booleans |
|
25.59 MB |
|
|
25 |
25. Modeling of smaller chassis components |
|
29.98 MB |
|
|
26 |
26. Modeling of the front bumper |
|
30.68 MB |
|
|
27 |
27. Modeling chassis cross sections |
|
18.58 MB |
|
|
28 |
28. Modeling of leaf spring assemblies |
|
52.77 MB |
|
|
29 |
29. Modeling of all hardware |
|
23.83 MB |
|
|
30 |
30. Poly modeling of pipe clamps |
|
28.51 MB |
|
|
31 |
31. Modeling of rivets layer management |
|
16.95 MB |
|
|
32 |
32. Placing hardware along models surface aligning pivots |
|
42.76 MB |
|
|
33 |
33. Creation and placement of steam lines |
|
38.18 MB |
|
|
34 |
34. Placement of clamps along steamline |
|
34.69 MB |
|
|
35 |
35. Modelingconfoming side hatch on boiler and side nameplate |
|
53.03 MB |
|
|
36 |
36. Connecting multiple splines to create complex shapes |
|
26.64 MB |
|
|
37 |
37. Modeling and placement of side steps |
|
38.15 MB |
|
|
38 |
38. Modeling of side tank along boiler |
|
22.41 MB |
|
|
39 |
39. Modeling support straps for tank model |
|
36.75 MB |
|
|
40 |
40. Modeling of additional tank component and additional elements |
|
54.16 MB |
|
|
41 |
41. Adding hardware to the boiler surface |
|
33.16 MB |
|
|
42 |
42. Modeling of ladders |
|
43.42 MB |
|
|
43 |
43. Modeling of main drivetrain component |
|
48.38 MB |
|
|
44 |
44. Model additional elements for the main drive train component |
|
45.50 MB |
|
|
45 |
45. Modeling of front platform and front bumper cover |
|
69.95 MB |
|
|
46 |
46. Modeling of connecting tube between boiler and drivetrain placement of hardware |
|
39.97 MB |
|
|
47 |
47. Modeling of the locomotive cabin walls |
|
41.32 MB |
|
|
48 |
48. Modeling of floor and roof models for the cabin |
|
34.84 MB |
|
|
49 |
49. Modeling of additional detail elements for the cabin |
|
32.25 MB |
|
|
50 |
50. Poly modeling of the large locomotive wheels |
|
48.52 MB |
|
|
51 |
51. Poly modeling of the smaller locomotive wheels |
|
31.94 MB |
|
|
52 |
52. Poly modeling of the brake arm |
|
39.76 MB |
|
|
53 |
53. Modeling of brake shoes |
|
54.64 MB |
|
|
54 |
54. Modeling and placement of axels and pins |
|
18.90 MB |
|
|
55 |
55. Modeling and placement of leaf spring connecting hardware |
|
42.15 MB |
|
|
56 |
56. Modeling of drivetrain component |
|
24.85 MB |
|
|
57 |
57. Modeling of drivetrain guide |
|
35.41 MB |
|
|
58 |
58. Modeling of drivetrain linkage |
|
59.60 MB |
|
|
59 |
59. Modeling large linkage element |
|
19.38 MB |
|
|
60 |
60. Detailing of large linkage element |
|
37.90 MB |
|
|
61 |
61. Modeling placement of front hatch hardware elements |
|
36.72 MB |
|
|
62 |
62. Modeling and placement of front hatch hinges |
|
24.38 MB |
|
|
63 |
63. Modeling of Hinge arms |
|
23.95 MB |
|
|
64 |
64. Modeling of front steam pipe placing of hardware |
|
33.22 MB |
|
|
65 |
65. Modeling of boiler straps |
|
42.87 MB |
|
|
66 |
66. Modeling of boiler support trusses |
|
34.10 MB |
|
|
67 |
67. Cloning and placement of boiler support brackets |
|
25.40 MB |
|
|
68 |
68. Modeling of main rear chassis component |
|
16.21 MB |
|
|
69 |
69. Modeling of smaller rear chassis components |
|
45.08 MB |
|
|
70 |
70. Modeling of chassis clamp |
|
19.54 MB |
|
|
71 |
71. Modeling of the main cow catcher components |
|
28.94 MB |
|
|
72 |
72. Adding additonal hardware to the cow catcher |
|
13.03 MB |
|
|
73 |
73. Creating conforming steam lines with the topology-splines Graphite Modeling Tools |
|
32.54 MB |
|
|
74 |
74. Modeling of pull string and supports |
|
30.40 MB |
|
|
75 |
75. Modeling of small cabin components |
|
26.33 MB |
|
|
76 |
76. Recap and additional comments |
|
7.15 MB |
|
|